Supply of 4 Amphibious Excavators with 3 year O&M for cleaning Gomti river, Lucknow
Uttar Pradesh Projects Corporation purchased four Long Boom Amphibian Excavators (with a 20-ton JCB long reach superstructure and imported amphibian undercarriage) and gave us the responsibility for three year operation and maintenance. We supplied, installed and commissioned the units at Gomti river in Lucknow where they were used for desilting the river and the sand removed was used to build gardens and walking track on both sides. Thereafter, these machines were shifted by our team to various rivers in Uttar Pradesh where they were working along side the cutter suction dredges for river channelisation projects as they had the unique ability to stand in the river and desilt while in floating condition |